2022 BMW M4 Competition xDrive at Audi Ontario
https://audi.dealerleads.com/cars/Used/2022/BMW/M4/Competition+xDrive/170886662022 BMW M4 Competition xDrive
Selling Price : $54,000
Vehicle Basics
Additional Incentives
- Condition : Used
- Mileage : 67,530
- VIN : WBS33BA06NCK00412
- Stock # : 11238K1
- Engine : Twin Turbo Premium Unleaded I-6 3.0 L/183
- Transmission : 8-Speed Automatic w/OD
- Ext. Color : Frozen Brilliant White Metallic
- Int. Color : Kyalami Orange/Black
- Vehicle Type : Convertible
- Body Style : Convertible
- Drivetrain : AWD
City MPG *
16
Hwy MPG *
23
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
SPRING CLEANING SALES EVENT, ONE OWNER, AUDI ONTARIO, DRIVER ASSISTANCE PRO PKG, PARKING ASSISTANCE PACKAGE, EXECUTIVE PACKAGE, NAVIGATION, COMPETITION, Active Driving Assistant Pro, Apple CarPlay & Android Auto Compatibility, Auto High-beam Headlights, Auto-dimming Rear-View mirror, Carbon Fiber Trim, Drive Recorder, Driving Assistance Professional Package, Executive Package, Extended Merino Leather Upholstery, Extended Traffic Jam Assistant, Exterior Parking Camera Rear, Front Ventilated Seats, Garage door transmitter, harman/kardon Surround Sound System, Head-Up Display, Heated Front Seats, Heated Steering Wheel, Lumbar Support, M Compound Brakes w/Red Calipers, M Sport Seats, Parking Assistance Package, Parking Assistant Plus, Power Front Seats, Rain sensing wipers, Remote Engine Start, Security system, SiriusXM w/360L, Steering wheel mounted audio controls, Turn signal indicator mirrors, Wheels: 19 x 9.5 Fr/20 x 10.5 Rr (Style 826M), Wheels: 19 x 9.5 Fr/20 x 10.5 Rr Silver. M4 Clean CARFAX. Frozen Brilliant White Metallic 2022 BMW Competition AWD 8-Speed Automatic Steptronic 3.0L I6 Turbocharged DOHC 24V LEV3-ULEV70 503hpRecent Arrival!
Vehicle Features
- M SPORT SEATS -inc: Heated Front Seats (STD)
- FRONT VENTILATED SEATS
- M SHADOWLINE LIGHTS
- FROZEN BRILLIANT WHITE METALLIC
- ICON ADAPTIVE LED HEADLIGHTS W/LASERLIGHT
- DRIVING ASSISTANCE PROFESSIONAL PACKAGE -inc: Active Driving Assistant Pro Extended Traffic Jam Assistant For limited access highways
- PARKING ASSISTANCE PACKAGE -inc: Drive Recorder Parking Assistant Plus
- EXECUTIVE PACKAGE -inc: Remote Engine Start Head-Up Display Heated Steering Wheel
- KYALAMI ORANGE/BLACK EXTENDED MERINO LEATHER UPHOLSTERY
- WHEELS: 19 X 9.5 FR/20 X 10.5 RR SILVER -inc: Style 826M M double-spoke
- M COMPOUND BRAKES W/RED CALIPERS
- CARBON FIBER TRIM
- Turbocharged
- All Wheel Drive
- Active Suspension
- Power Steering
- ABS
- 4-Wheel Disc Brakes
- Brake Assist
- Locking/Limited Slip Differential
- Aluminum Wheels
- Tires - Front Performance
- Tires - Rear Performance
- Heated Mirrors
- Power Mirror(s)
- Integrated Turn Signal Mirrors
- Power Folding Mirrors
- Rear Defrost
- Intermittent Wipers
- Variable Speed Intermittent Wipers
- Rain Sensing Wipers
- Rollover Protection Bars
- Convertible Soft Top
- Daytime Running Lights
- Automatic Headlights
- Headlights-Auto-Leveling
- LED Headlights
- Automatic Highbeams
- AM/FM Stereo
- Satellite Radio
- HD Radio
- Requires Subscription
- MP3 Capability
- Steering Wheel Audio Controls
- Auxiliary Audio Input
- Hard Disk Drive Media Storage
- Satellite Radio
- Requires Subscription
- Premium Sound System
- Bucket Seats
- Power Driver Seat
- Power Passenger Seat
- Heated Front Seat(s)
- Power Driver Seat
- Power Passenger Seat
- Pass-Through Rear Seat
- Rear Bench Seat
- Adjustable Steering Wheel
- Trip Computer
- Power Windows
- Leather Steering Wheel
- Keyless Entry
- Power Door Locks
- Keyless Start
- Keyless Entry
- Power Door Locks
- Hands-Free Liftgate
- Universal Garage Door Opener
- Cruise Control
- Climate Control
- Multi-Zone A/C
- A/C
- A/C
- Rear A/C
- Leather Seats
- Auto-Dimming Rearview Mirror
- Driver Vanity Mirror
- Passenger Vanity Mirror
- Driver Illuminated Vanity Mirror
- Passenger Illuminated Visor Mirror
- Floor Mats
- Mirror Memory
- Seat Memory
- Navigation System
- Smart Device Integration
- Telematics
- Requires Subscription
- Bluetooth Connection
- Keyless Start
- Power Door Locks
- Power Windows
- Trip Computer
- Navigation System
- Driver Adjustable Lumbar
- Passenger Adjustable Lumbar
- Pass-Through Rear Seat
- Security System
- Immobilizer
- Traction Control
- Stability Control
- Traction Control
- Front Side Air Bag
- Rear Parking Aid
- Blind Spot Monitor
- Cross-Traffic Alert
- Rear Collision Mitigation
- Lane Departure Warning
- Front Collision Mitigation
- Driver Monitoring
- Tire Pressure Monitor
- Driver Air Bag
- Passenger Air Bag
- Passenger Air Bag Sensor
- Knee Air Bag
- Back-Up Camera
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.